Pumping Stations Upgrade, England, U.K.
In 2,012, CLH purchased the British GPSS, Government Pipelines and Storage System, the liquid hydrocarbon storage and transportation military facilities, thus giving rise to CLH-PS
After the purchase DISEPROSA upgraded for CLH-PS five (5) of their old pumping stations.
SERVICES
- Basic Engineering
- Detailed Engineering
- Construction Supervision
- Inspection and Audit of all the Storage Farms
Pipelines and Gas Pipelines
CLIENT
EXOLUM (former CLH-PS)
LOCATION
Stoke, Redmile, Neetlestead, Rawcliffe and Misterton, England, United Kingdom
DATE
2018 - 2021
LENGTH
2,000 km Oil Pipelines/ Multyproducts