S.F. Le Caroubier, Algiers, Argelia
DISEPROSA, together with Elecnor, developed an EPC proposal for the increase of the storage capacity of NAFTAL’s facilities in Algiers
The Project also included the complete automation and modernisation of the existing plant, the extension of the truck loading bay with 3 new bays and the construction of different technical and administrative buildings, such as Control Room, Equipment Room and staff facilities.
Proposed Tanks:
- 4 GO Tanks; Ø= 36 m
- 4 Gasoline Tanks; Ø= 26 m
- 3 JET A1 Tanks; Ø= 22 m
SERVICES
- Business Plan
- Financial Plan
- Definition of Storage Contracts
- Conceptual Design
- Basic Engineering
- FEED
Storage Facilities (S.F.)
CLIENT
NAFTAL
LOCATION
Algiers, Argelia
DATE
2016
STORAGE
135,000 m³ of fuels (Gasoline, Diesel and JET A1)